Front-End Loading (FEL)

« Back to Glossary Index« Back to Previous Page

Definition:
A project management process involving thorough planning and design at the early stages of a project to minimize risks and ensure alignment with business objectives. FEL is typically divided into phases (FEL-0 through FEL-3), each with specific deliverables and decision points.

Key Components:

  • FEL-0: Business Opportunity Identification
  • FEL-1: Conceptual Development and Feasibility Assessment
  • FEL-2: Scope Definition and Preliminary Design
  • FEL-3: Front-End Engineering Design (FEED)

Use Cases/Industries:

  • Energy Sector: Oil and gas exploration projects
  • Petrochemical Industry: New plant developments
  • Pharmaceuticals: Facility expansions

Advantages:

Challenges:

  • Resource Intensive: Requires significant upfront investment
  • Time-Consuming: Extensive planning can extend project timelines

Related Terms:
Front-End Engineering Design (FEED), Stage-Gate Process

Example:
A petrochemical company employs the FEL process to evaluate the feasibility of constructing a new processing plant, ensuring all potential risks and costs are assessed before proceeding.

Visited 1 times, 1 visit(s) today
Synonyms:
Front-End Planning (FEP), Pre-Project Planning (PPP), Early Project Planning